Tetherow Twins Nearing Completion - Lot 7 Images

A few progress photos of our two modern houses under construction in Tetherow, above South Century Drive. Not much longer now for Lot 7 . . .

Lot 7 - Standing seam metal roof and siding w/ fiber cement and natural cedar accents

Lot 7 - Standing seam metal roof and siding w/ fiber cement and natural cedar accents

Lot 7 -  Lots of cedar on the front elevation

Lot 7 -  Lots of cedar on the front elevation

Lot 7 - Wood flooring being installed, wrapping up the wall beyond the kitchen cabinetry

Lot 7 - Wood flooring being installed, wrapping up the wall beyond the kitchen cabinetry

Lot 7 - Steel-wrapped gas fireplace

Lot 7 - Steel-wrapped gas fireplace

Construction Commencing Out at Tethrow

We're proud to share a few images of the early construction progress for our two neighboring residences in Tetherow. It'll go VERY quickly from here on out!

Spread Footings in Place . . . and Great Mountain Views!

Spread Footings in Place . . . and Great Mountain Views!

Spread Footing @ Patio Sliders

Spread Footing @ Patio Sliders

Stem Wall Formwork Ready to be Stripped

Stem Wall Formwork Ready to be Stripped

3D Printed Jewelry in Progress

We've been working on a line of 3D printed jewelry over the past few months; here are a few images of the first pieces. These initial renderings will have to do until we can get good photos of the finished work.